in Onitsha Nigeria sales price shop near me near me shop factory supplier Rock Drill Jack Hammer Yt23 Air-Leg Rock Drill manufacturer best Cost Custom Cheap wholesaler

  in Onitsha Nigeria  sales   price   shop   near me   near me shop   factory   supplier Rock Drill Jack Hammer Yt23 Air-Leg Rock Drill manufacturer   best   Cost   Custom   Cheap   wholesaler

If you are interested in any of our items or would like to discuss a likely get, you should come to feel free to speak to us. we are assured to provide our customers adaptable and diversified providers. Hangzhou EPG Co.,Ltd. , was established in November, 1997. With its 5 wholly owned subsidiaries. rock drill jack hammer Yt23 Air-Leg Rock Drill
Instruction
The rock drill of YT23 is a sort of high performance air leg rock drill EPTTry. It is largely utilised for blasting holes and other drilling operates in a quarries, railway construction, drinking water conservancy design and defence task faXiHu (West EPT) Dis.Hu (West EPT) Dis.ty.
When it is matched with the Model FY200A Oil reservior and Design FT160A or FT160B Air-leg, it can complete wet drilling and blast holes from distinct and angles.

Product No. YT23(7655) Airleg rock drill
weight 24kg
air intake 80L/S
influence frequency 36Hz
air force .64Mpa

Servicing
. Notice
1. Dismantle new EPTT and thoroughly clean components ahead of using new EPTT, when assembling EPTT, oil elements. then work and verify EPTT before utilizing it, but the time is about 10minutes and air stress is lower (.3Mpa for EPT).
two. The air force ought to be retained at .5-.63 MPa.(evaluate in rubber tube), if the air stress is also large, it will injury components.if the air stress is way too reduced,it will influence the velocity of drilling and EPTT regular operating
three. Ahead of using EPTT, blow off dirty to protect components. inspect the screw thread regardless of whether is restricted and running manage whether or not is totally free to shift, ensure EPTT operate usually.
four. Oil lubricating oil into oil lubricator just before using EPTT, oil oil reservoir each other hour.Do not operate EPTT with no lubricating oil.
5. Ahead of employing EPTT, increase EPTT EPTT,even though operate EPTT increasingly. Donot operate EPTT at the max thrust or must not idle EPTT too EPTT, it will injury areas.
6. Diamantle drinking water pipe and work EPTT after blasting holes. It can blow off the rest humidity and defend parts away from rusting .

7,The rock drill is centre drinking water-EPT drilling. Do not run without having water and dismantle
drinking water needle.
eight. Tighten two facet bolt nuts to protect elements and tighten air pipe to aviod leading to injure
9. If EPTT ought to keep for a EPTT time.diamantle EPTT 1st , oil and seal , then put a dry place.

. Security
1. Ensure that specialized protected practices are used.
two. Spend consideration to the place of steel wire ring clamp.
3. Examine metal wire ring clamp no matter whether or not abrase, if so, change an additional at when.
4. Do not enable ues minimal burning stage and simple explosion lubricating oil.

  in Onitsha Nigeria  sales   price   shop   near me   near me shop   factory   supplier Rock Drill Jack Hammer Yt23 Air-Leg Rock Drill manufacturer   best   Cost   Custom   Cheap   wholesaler

  in Onitsha Nigeria  sales   price   shop   near me   near me shop   factory   supplier Rock Drill Jack Hammer Yt23 Air-Leg Rock Drill manufacturer   best   Cost   Custom   Cheap   wholesaler